|
|
IBM Corporate Headquarters Markham, ON
Extensive repair to the expansion joint systems was required at the IBM Corporate Headquarters parking garage in Markham, Ontario. For this project, the CR-Series expansion joint was used. In addition, there were some areas where water was trickling down the walls of the structure. The Flexible Gutter System was used to direct that water away from the mechanical room below. Read More About This Project
|
The Crossing - Anaheim, CA |
 |
|
|
The JP-Series expansion joint system was used for the parking garage at this apartment complex in Anaheim, California. The materials were installed by Harel Construction Specialties on the podium level topping slab over the garage. Read More About This Project |
|
|
ERIE METAL SPECIALTIES, INC.
13311 Main Road
Akron, NY 14001
Phone: (716) 542-3991
Fax: (716) 542-3996
E-Mail: sales@eriemetal.com
|